- Birmingham general contractor · B6

Restaurant Renovation and Full Installation in Birmingham

RMM Builders Ltd delivers restaurant renovation and full installation in Birmingham as one managed project, covering construction, the commercial kitchen, extraction, mechanical and electrical services, finishes, testing and handover.

Every regulated installation on an RMM Builders project is carried out under the scheme that governs it.

Building Regulations
Building Control sign-off
Gas Safe Register
Gas and boiler work
BS 7671
18th Edition wiring regulations
Structural warranty
Provider stage inspections
CDM 2015
Construction phase plan
CSCS & SMSTS
Carded, supervised sites

DEV NOTE, REMOVE BEFORE PUBLISH: scheme and standard names, not accreditation claims. Do not swap in third-party logos without written permission from the mark holder.

—Key facts, checked against primary sources

Six things worth knowing before you commit to a new build

Reviewed 29 August 2026. Tax rules, energy standards and lender requirements change. Confirm the current position with HMRC, your lender and your Building Control body before you commit.

—Read this first

What has to be in place before we can start

With the entry conditions clear, here is what the contract itself covers.

—Scope

From an empty plot to a house with its certificates

A new build contract covers groundworks, structure, envelope, building services, internal finishes, external works and the documented handover of a completed dwelling.

A new house is a different job from an extension, and not only in size. There is no existing structure to tie into, no existing drainage to reuse and no existing supplies to extend. Everything from the foundations to the incoming water main is new, which means everything is inspected, and the inspection sequence is what sets the programme.

RMM Builders manages the complete programme, coordinates every trade and remains your single point of responsibility. We build against your drawings, book the Building Control inspections, hold the site open for your warranty provider’s stage checks, and collect the certificates as each element is signed off rather than chasing them at the end.

The shape of that programme changes with the kind of plot you are building on. See also house extension builders if you are adding to an existing home rather than building a new one.

Construction worker laying bricks on a rooftop with a cityscape background.

— Plot types

The kinds of new build we take on

RMM Builders builds four recognisable types of new dwelling, each with a different planning and site constraint behind it.

Self-build on your own plot

A self-build is a new dwelling commissioned by the person who will live in it, on land they own. You hold the permission and the drawings, and we build to them.

Replacement dwelling

A replacement dwelling demolishes an existing house and builds a new one in its place. Demolition, existing services and the footprint permitted by the consent all shape the programme.

Infill plot

An infill plot is a gap between existing buildings, usually a former garden or side plot. Access, party walls and neighbouring foundations are the constraints that decide the build sequence.

Custom build

A custom build starts from a serviced plot with an outline design, which you then adapt. The base specification is set, and your changes are priced against it.

Whichever type you are building, the permission comes before anything else. See loft conversion specialists if you are extending upward instead.

—Permission

Planning permission is yours, and it comes first

Permission decides whether you can build. Building Regulations decide how. See the planning permission guide and the Planning Portal.

Two construction workers organize wooden planks on a table at a sunny outdoor site.

− BUILDING CONTROL

Inspected as it goes up, signed off at the end

Building Regulations set the standards a new dwelling must meet, and Building Control inspects the work at defined stages before issuing a completion certificate.

A new house is normally submitted as a full plans application rather than a building notice, because the design is checked before work starts rather than judged on site. Inspections follow the build: excavation and foundations, damp-proof course and oversite, drainage before backfill, structure, insulation and airtightness, then completion.

RMM Builders books those inspections into the programme and holds the work open until each one is done. Covering an element before it is inspected is the most avoidable delay on a new build, because the only remedy is opening it back up.

The completion certificate is issued by the council’s building control team or an approved inspector, not by us. We build to the standard, arrange the inspections and hand you what they issue.

Building Control confirms the house meets the regulations. A warranty is a separate question, and it is the one your lender will ask about. See Building Regulations approval.

—Warranty

Structural warranty, and what your lender actually requires

.

Building Control completion certificate

Structural warranty

What it confirms     

The work met the Building Regulations 

Insurance-backed cover if the structure later fails     

Who issues it

The council’s building control team or an approved inspector

A warranty provider such as NHBC, LABC Warranty or Premier Guarantee

Typical duration

A one-off certificate on completion

Commonly ten years from completion

Inspections during the build

Building Control stage inspections

The provider’s own technical stage inspections

Does a lender require it

Generally expected

Decided by the individual lender, with no universal mandate

Warranty affects your borrowing. VAT affects your budget, and it is the part most people get wrong. See the UK Finance warranty guidance.

—VAT

New builds are not simply VAT free

Item

Typical VAT treatment on a qualifying new dwelling

Construction work by the contractor

Zero-rated where the four conditions are met

Materials supplied and incorporated by the contractor

Same rate as the work they form part of

Architect, surveyor, consultancy and supervisory fees

Always standard-rated, even inside a construction contract

Certain fitted items not treated as building materials

Can remain standard-rated

Materials you buy yourself as a self-builder

Paid with VAT, potentially reclaimable under the DIY housebuilders scheme

The DIY housebuilders scheme allows one claim

Self-builders can reclaim VAT on eligible materials and services through the DIY housebuilders scheme, and only one claim can be made per project.

For projects completed on or after 5 December 2023 the claim must be made within six months of completion. Keep every invoice from the first delivery, because a claim assembled from memory at the end is a claim with gaps in it.

The Community Infrastructure Levy may apply

Community Infrastructure Levy is a charge some local authorities apply to new development, with a self-build exemption available in defined circumstances. The exemption has to be claimed correctly and in the right order relative to starting work. Check the position with your local authority before commencement, because the consequences of getting the sequence wrong are financial and not always reversible.

Budget settled, the next question is what standard the house has to be built to. See VAT Notice 708 and the DIY housebuilders scheme.

—Energy standards

The standard your house is built to depends on when you apply

Part L of the Building Regulations sets the energy efficiency standard for a new dwelling, and the Future Homes Standard raises it further.

Which version applies to your build is decided by when your Building Regulations application is submitted and by the transitional arrangements in force at the time. That is a moving target, and a page that names a fixed standard goes out of date quickly. RMM Builders confirms the applicable standard with your Building Control body at design stage rather than assuming it.

What it changes on site is real. Fabric performance, airtightness testing, ventilation strategy under Part F and the heating system you can specify all follow from the standard that applies. A heating decision made on the assumption of an older standard can force a redesign, so it is worth settling early.

With the standard set, the build itself runs to a fixed sequence. See heating and hot water systems.

 
Team of construction workers laying concrete on a rooftop, emphasizing teamwork.

—Survey to handover

The eight stages of a new build

A suburban house undergoing major renovations with scaffolding and building materials.
Site survey and drawing review

We visit the plot, read your planning consent and go through the drawings before quoting anything. We check access, levels, existing services, ground conditions flagged by your engineer, and the conditions attached to your permission that have to be discharged before work can start.

Written scope and price

You receive a written, itemised scope covering inclusions, exclusions, assumptions and provisional sums, with a programme. Provisional sums are named rather than buried, so you can see which parts of the price are fixed and which depend on a decision or a survey still to come.

TPre-commencement and approvals

We confirm the pre-commencement conditions are discharged and the Building Control application is in place before mobilising. Warranty provider registration, Party Wall notices where they apply and utility applications all get started here, because lead times on connections are long.

Groundworks and foundations

We set out the building, excavate, and construct the foundations to the engineer's design. Foundations are inspected before concrete and drainage is inspected before backfill. Both are held open until Building Control has seen them.

Structure and envelope

We build the superstructure, roof and external envelope to make the house weathertight. Weathertight is the milestone the rest of the programme depends on, because first fix cannot sensibly start until the building is closed in.

First fix and services

We install the plumbing, heating, electrical and ventilation first fix, then insulate and board. Every service is inspected before it is covered. Airtightness detailing happens here, not later, because it cannot be retrofitted once the boards are on.

Second fix and finishes

We complete second fix services, joinery, kitchens, bathrooms, decoration and external works. Testing and commissioning of the heating, ventilation and electrical installations runs alongside the finishing rather than after it.

Completion and handover

We complete the final inspections, close the snagging list and hand over the certificates and records. You receive the Building Control completion certificate, the electrical and gas documentation, commissioning records, warranties and the operating information for the systems installed.

Registration decides who can do the work. The next table decides who is responsible for what. See electrical distribution and testing, plumbing services in Birmingham, heating and hot water systems and air conditioning installation.

—Regulated work

Qualified professionals for every regulated element

Element

Scheme or standard

What you hold at the end

Gas installation and appliances

Gas Safe Register

Gas Safe Building Regulations Compliance Certificate

Electrical installation

Part P of the Building Regulations, wired to BS 7671

Electrical Installation Certificate plus Building Regulations notification

Structural design

Chartered or professionally registered structural engineer

Calculations and the engineer’s reports

Air conditioning and heat pumps

F-Gas company certification plus qualified engineers

Commissioning record and F-Gas documentation

Airtightness and ventilation

Part L and Part F of the Building Regulations

Air test result and ventilation commissioning record

The dwelling as a whole

Building Regulations

Building Control completion certificate

Registration decides who can do the work. The next table decides who is responsible for what. See electrical distribution and testing, plumbing services in Birmingham, heating and hot water systems and air conditioning installation.

—Who does what

Who manages it, who issues it, and what stays with you

Scheme or standard

RMM Builders manages

You as client remain responsible for

The construction programme and trade coordination

Building Control completion certificate

Buying the land and holding title

Booking Building Control and warranty stage inspections

Electrical installation certification

The planning application and discharging its conditions

Construction phase plan where RMM is appointed principal contractor and one is required

Gas Safe compliance certification

Appointing the architect and structural engineer

Site rules, inductions, welfare and inspection records

Structural calculations and engineer’s reports

Arranging the structural warranty and site insurance

Variation records and scope control

Air test and commissioning records

Mortgage, self-build finance and drawdown

Snagging and assembly of the handover pack

Warranty documentation from the provider

VAT reclaim under the DIY housebuilders scheme

Utility connection coordination on site

Utility providers’ own connection agreements

Community Infrastructure Levy and any self-build exemption

With responsibility clear, the next question is what moves the number. See interior design and layout coordination.

— Before you compare quotes

What drives the cost of a new build home in
Birmingham

Driver

Impact

What it means on site

Ground conditions and foundation design

Largest

Made ground, clay shrinkage, a high water table or nearby trees can move you from a strip foundation to piles, and that decision is made before anything visible exists.

Utility connections

Largest

New water, electricity, gas and drainage connections run on the utility providers’ own timescales and quotes, and a plot with no service in the road is a different project from one with services at the boundary.

Drainage strategy

Large

Whether you can connect to a public sewer, need a pumped system, or require attenuation or a treatment plant changes both cost and programme.

Access and site constraints

Large

A tight infill plot with no compound space, restricted deliveries and neighbours on both boundaries costs more to build than an open plot of the same size

Structural form and storeys

Moderate

Spans, openings, the number of storeys and whether the design uses masonry or timber frame all change the structure and the programme.

Energy standard and fabric

Moderate

The applicable Part L standard drives insulation, glazing, airtightness detailing and the heating system you can specify

Specification and finishes

Moderate, and yours to control

Kitchens, bathrooms, glazing, flooring and joinery can move the finish cost substantially without changing a single structural decision.

Statutory and survey costs

Ongoing

Building Control fees, warranty premiums, ground investigation, ecology or drainage surveys and Party Wall awards are fixed costs you cannot design out.

The largest savings on a new build are made before the foundations go in.

Cost understood, the honest question is whether we are the right builder for your plot at all. See the cost guide for how we price building work generally.

—Straight answer

When you should call someone else

RMM Builders is the wrong choice for four kinds of new build enquiry, and saying so saves both of us a wasted survey.

If that describes you, where the plot sits decides whether we can supervise it properly. See all building, installation and renovation services.

—Coverage

Where we build across Birmingham

RMM Builders works from 104 Ettington Road in B6 and builds new homes across Birmingham and 24 named areas in Solihull, Sandwell, Walsall and Dudley.

New build plots in Birmingham are rarely open fields. Most are infill: a former garden, a side plot on a 1930s semi-detached street, or a replacement dwelling on an existing footprint. That brings party walls, shared access, neighbouring foundations of unknown depth and streets where a concrete pump cannot easily stand. Conservation areas in Moseley and Edgbaston add constraints on what a new frontage can look like. We survey the access before we price the house, because on an infill plot access shapes the programme as much as the design does.

restaurant services
kitchen cabinet
[CONFIRM PROJECT NAME]

[CONFIRM: plot type, storeys, floor area, area]

Type: [CONFIRM]       Programme: [CONFIRM]

—Completed work

New builds we have completed

DEV NOTE, REMOVE BEFORE PUBLISH: if no completed new build has been photographed, delete this entire section rather than filling it with stock imagery. On a YMYL page a stock house photograph is worse than an empty section.

Photographs show the result. The questions below cover what people ask before committing. See all building and renovation projects.

Got a plot and a permission?

RMM Builders surveys the plot, reads your consent and drawings, and issues one written scope and price before anything starts.

 

Questions people ask before building a house

These are the ten questions RMM Builders is asked most often before a new build contract is agreed.

—Common questions

A new dwelling needs planning permission from the local planning authority before construction can lawfully begin. RMM Builders builds under a permission you already hold and reads the conditions attached to it before pricing, because conditions that must be discharged before commencement decide when work can actually start. We cannot promise that any application will be granted.

Construction of a qualifying new dwelling can be zero-rated for VAT, but architectural, surveying, consultancy and supervisory services are always standard-rated, even inside a construction contract. Materials that RMM Builders supplies and incorporates take the same rate as the work they form part of. RMM Builders is not a tax adviser, so confirm your position with HMRC or a qualified adviser.

Self-builders can reclaim VAT on eligible materials and services through the DIY housebuilders scheme, and only one claim can be made per project. For projects completed on or after 5 December 2023 the claim must be submitted within six months of completion. Keep every invoice from the first delivery onward.

A structural warranty is insurance-backed cover against defects in the structure of a newly built home, typically running ten years. There is no universal rule requiring one. UK Finance states that the decision on whether a warranty and its provider is acceptable rests with the individual lender, so confirm the requirement with your lender before you start rather than after.

The Building Control completion certificate is issued by the council’s building control team or an approved inspector, not by the builder. RMM Builders books the inspections into the programme, holds the work open until each is done, and hands you the certificate along with the electrical, gas and commissioning documentation at handover.

RMM Builders builds from drawings prepared by your architect and structural engineer, and does not author the design. We review the drawings before pricing and tell you where a detail will not work on site, which is a different service from designing the house. If you need design input on interiors, our interior design service covers layout and material coordination.

A new build programme depends on the ground conditions, the utility connection lead times, the structural form and the specification, so RMM Builders sets a target programme in your written scope at stage two rather than quoting a duration before the survey. Utility connections and ground conditions are the two variables that most often move a completion date.

Ground conditions are the most common source of variation on a new build, because nobody can see below the surface until it is open. A ground investigation before the design is finalised reduces the risk substantially. Where a change is needed, RMM Builders prices the variation in writing and you approve it before the work is carried out.

All regulated work on an RMM Builders new build is carried out by appropriately qualified and registered professionals. Gas work sits under the Gas Safe Register and notifiable electrical work is carried out to BS 7671 under Part P. RMM Builders manages the complete programme, coordinates every trade and remains your single point of responsibility, and relevant testing, compliance documentation and certificates are provided at handover where applicable.

RMM Builders builds single dwellings for the people who will own them, on land the client already holds. Volume housebuilding with sales, reservations and consumer-code obligations is a different business, and we do not present ourselves as a developer.

If your question is about a specific part of the build, the trade pages go deeper. See all customer questions answered.

Who wrote this and how it is kept current

Written and reviewed for RMM Builders Ltd by [CONFIRM NAME], [CONFIRM ROLE]. [CONFIRM: one sentence on their construction experience and any qualification or professional membership held.] RMM Builders Ltd · 104 Ettington Road · Birmingham B6 6EB · 07481 115843 Last reviewed: 29 August 2026. Review cycle: every six months, and immediately when a cited rule changes. This page gives general information about building a new home. It is not tax, legal, planning or financial advice. RMM Builders Ltd is a building contractor, not a tax adviser, mortgage adviser, planning consultant or warranty provider. Confirm your own position with the relevant authority or a qualified adviser before you rely on anything here.

—About this page

Where the regulatory statements come from

HMRC, Buildings and construction (VAT Notice 708) · zero-rating conditions and the standard-rating of professional fees GOV.UK, Claim a VAT refund for a new home or charity building · DIY housebuilders scheme, single claim and six-month deadline UK Finance, Mortgage Lenders' Handbook warranty guidance · lender discretion on warranty acceptance GOV.UK, Building Regulations approval · approval routes and completion Planning Portal · planning permission for new dwellings Every regulatory statement on this page was checked against the source above on 29 August 2026. Where a rule has a date attached, the date is stated in the text.

—Sources

Planning to build on your own plot?

RMM Builders replies to every enquiry the same working day and surveys the plot before quoting any new build.

Have the plot address, your planning reference, your drawings and any ground investigation report to hand. If you do not have all of it yet, send what you have and we will tell you what is missing.

 
e.g., James Harrison
e.g., 07481 115843
e.g., james@example.co.uk
e.g., B6 (Aston)
Services
Please provide any details about structural changes, dimensions, or specific trades required...

Prefer to talk it through first? Call 07481 115843.

—Site survey · No obligation

Scroll to Top